1. Wastewater technical approval is an approval by the government that states that the company must comply with environmental protection and management standards when managing and treating wastewater. 2. Wastewater technology approval may be exempted if the company uses a third-party (including within the industrial park) existing wastewater technology approval for wastewater treatment. 3. In the second case, a letter of explanation is required stating that no wastewater technical approval is required or a letter of explanation that no wastewater technical approval is required. 4. The company’s wastewater treatment activities are divided into: a. Disposing of wastewater in surface water (rivers and lakes) b. Applying wastewater to land c. Disposing of wastewater to a certain location d. Disposing of wastewater in the sea 5. Technical approval documents are divided into two types: technical standard documents and technical analysis report documents. When specifying technical approval documents, they will be based on the usage or wastewater treatment and the KBLI number, for example:
6. The wastewater technology approval remains valid as long as there are no changes in the wastewater volume and wastewater management system 7. If there is no wastewater technology approval or if it has not been prepared, environmental technology approval cannot proceed. 8. After the trial period specified in the wastewater technology approval document ends, the company must notify and report that the installation of the IPAL/WWTP has been completed in order to obtain the SLO operation certificate (which is also one of the conditions for the IPAL/WWTP). |
Processing Time : 5 Months Required Documents : 1. Company Articles of Association and Amendments 2. Ministry of Justice Approval and Amendments 3. NPWP (Tax Identification Number) of the Company 4. NIB (Business Identification Number) 5. Standard Certificate/Business License 6. OSS Account and Password 7. Company Email Address and Password 8. PTSP-LHK Account and Password (if applicable) 9. Director and Commissioner Identification Cards, Passports, KITAS, Tax Cards, Phone Numbers 10. Company Profile 11. DED/SITE PLAN Factory Layout Design 12. Factory Photos (with installed equipment) 13. Employee Information (Number, Gender, Local vs. Outsider Ratio) 14. SOP Documents (Raw Material and Auxiliary Material Purchasing SOP, Raw Material and Auxiliary Material Receiving SOP, Raw Material and Auxiliary Material Storage SOP, Production Process SOP, Packaging SOP, Product Storage SOP, Shipping SOP, Emergency SOP, etc.) 15. List of Equipment Using Water 16. Sewage Treatment Plant Drawings 17. Sewage Treatment Plant Plan 18. Investment Amount for Sewage Treatment Plant (as a percentage of total investment) 19. Sewage Treatment Plant Construction Timeline 20. Domestic Wastewater Treatment Drawings 21. Domestic Wastewater Treatment Plan 22. Water Quality Test Results Before Wastewater Treatment (if available) 23. Sludge and Gas Treatment Plan 24. PPA & POPAL Technical Specialist Certification (if available) |