skip to content
Construction Engineering B-level General Contracting Qualification
Construction Engineering B-level General Contracting Qualification Processing Including Application For Construction Materials And Equipment Information On The System And Application For Performance Contracts On The System
Basic Informations

1.      General contracting qualification is a business area of a construction service business entity working in the field of construction implementation, planning and supervision (EPC). The scope of work includes planning, implementation and integrated construction supervision services (EPC), covering the construction of buildings, industrial and factory facilities, transportation facilities and infrastructure, water facilities and infrastructure, including the construction of onshore or offshore oil and gas industries. Facilities, comprehensive construction service work includes: design and construction, planning, procurement and acceptance execution (engineering, procurement and construction), implementation of turnkey projects, and/or performance-based work implementation.

2.      Oreign-funded construction companies can only be in the form of joint ventures. Foreign and local shareholders must be construction companies. Foreign capital shall not exceed 67% of the shares, and local joint ventures must account for at least 33% of the shares. The joint venture must be a local B-grade construction company in Indonesia and have the construction qualification corresponding to the business scope of the joint venture subsidiary.

3.      The SBU applied by BUJKA, PT PMA and the local construction company is B grade (the highest construction qualification level in Indonesia). The two subjects have different application conditions for applying for SBU:

1. BUJKA

a. (Parent Company) Net Asset Requirements: 35 Billion Rupiah (About 15.75 Million RMB)

b. (Parent Company) Performance Contract Requirements: 100 Billion Rupiah (About 45 Million RMB)

c. A Head of The Representative Office (PJBU) Is Required to be Concurrently Held by the Chief Representative

d. At Least One Technical Leader (PJT) With a SKK Certificate

e. Each qualification classification must have at least one person in charge (PJSK) and have a SKK certificate

2. PT PMA B

a. (Local) Net Asset Requirements: 25 Billion Rupiah (About 11.25 Million RMB)

b. (Local) Performance Contract Requirements: 50 Billion Rupiah (About 22.5 Million RMB)

c. A Representative Office (PJBU) is required to be concurrently held by the director of the company.

d. At least one technical leader (PJT) with a SKK certificate

e. Each qualification classification must have at least one person in charge (PJSK) and have a SKK certificate

3. PT PMDN B

a. (Local B) Net Asset Requirements: 25 Billion Rupiah (About 11.25 Million RMB)

b. (Local B) Performance Contract Requirements: 50 Billion Rupiah (About 25 Million RMB)

c. A representative office head (PJBU) is required to be concurrently held by the director of the company

d. At least one technical person in charge (PJT) with a SKK certificate

e. Each qualification classification must have at least two person in charge (PJSK) and have a SKK certificate

4.      Before applying for the SBU, you must register with the Construction Association and obtain the membership certificate KTA of the Construction Association.

5.      When applying for SBU, you must submit an ISO 37001 certificate (anti-bribery management system) and a list of engineering equipment.

6.      The service includes submitting application for construction materials and equipment information on the SIMPK system (equipment provided by the customer)

7.      The service is included in submitting an application performance contract on the SIMPAN system (the performance contract provided by the customer)

 

Processing Time & Required Documents

Processing Time : 35 Working Days

Required Documents :

BUJKA

1.      Technician Certificate (SKK)

2.      Membership certificate of the construction association (KTA)

3.      Certificate ISO 37001 (Anti-Bribery Management System)

4.      OSS system user and password

5.      List of engineering equipment data

a. Equipment information

b. Location of equipment

c. Name of the owner

d. Proof of ownership

e. Equipment photos

f. Declaration letter containing tool specifications

6.      Letter of Intent, Letter of Appointment, Letter of Statement (notary double certification)

7.      Information Of The Chief Representative:

a. Scanned passport

b. ID photo (electronic version, red background)

c. Phone number and email address

d. Declaration letter (template provided by SHM)

e. Temporary residence permit KITAS

f. Personal tax card NPWP

g. Personal selfie (Indonesian with passport; non-Indonesian with ID card)

8.      Parent company information:

a. Articles of Association (sworn translation + notary double certification (English version/Indonesian version))

b. Business license (sworn translation + notarized double certification (English version/Indonesian version))

c. Performance contract (Chinese-Indian/Chinese and English version, notarized and certified)

d. RAB (print/English version)

e. Completion Report BAST (printed/English version)

f. Audit report of the past two years (printed/English version, notarized double certification)

 

PT PMA / PT PMDN

1.       Technical Specialist Certificate SKK

2.       Membership Certificate of Construction Association KTA

3.       ISO 37001 (Anti-Bribery Management System) Certificate

4.       List of engineering equipment data

a. Equipment information

b. Location of equipment

c. Name of the owner

d. Proof of ownership

e. Equipment photos

f. Declaration letter containing tool specifications

5.       Articles of association and changes (if any)

6.       Approval and changes of the Ministry of Justice (if any)

7.       Corporate tax card and tax registration certificate

8.       Business Registration Certificate NIB

9.       OSS system user and password

10.     Director’s personal ID photo (electronic version, red background)

11.     Performance contract (Chinese-Indian/Chinese and English version, notarized double certification / The Hague certification) K-level does not need to provide performance contract

12.     Calculation details RAB (printed/English version) K level does not need to provide calculation details

13.     Completion report BAST (printed/English version) K-level does not need to provide completion report

14.     Audit report of the past two years (printed/English version, notarized double certification)

 

Scroll to Top