skip to content
Power Qualification Certificate (SBUJPTL)
Power qualification SBUJPTL is a qualification certificate that enterprises engaged in power support services. The services include: power device construction and installation, power device operation and power device maintenance. Only with the power qualification SBUJPTL can the business license IUJPTL be activated.
Basic Informations

1.      Power qualification SBUJPTL is a qualification certificate that enterprises engaged in power support services. The services include: power device construction and installation, power device operation and power device maintenance. Only with the power qualification SBUJPTL can the business license IUJPTL be activated.

2.      The foreign power company PT PMA and the local power company PT PMDN power qualification SBUJPTL are valid for 5 years.

3.      The power representative office KPJPTL power qualification SBUJPTL is valid for 3 years.

4.      The shareholding ratio of the foreign power company PT PMA in applying for power qualification SBUJPTL can be 100%.

5.      The power representative office BUJKA and the foreign power company PT PMA can apply for SBUJPTL. The two subjects have different application conditions for SBUJPTL, as follows:

Construction and installation

 

Power Representative Office KPJPTL

Foreign power company PT PMA

Net assets

35 Billion Rupiah (About 15.75 Million RMB)

25 Billion Rupiah (About 11.25 Million RMB)

Performance contract

10 Billion Rupiah (About 45 Million RMB)

50 Billion Rupiah (About 22.5 Million RMB)

 

Operation

 

Power Representative Office KPJPTL

Foreign power company PT PMA

Net assets

25 Billion Rupiah (About 11.25 Million RMB)

Performance contract

50 Billion Rupiah (About 22.5 Million RMB)

*Note: KPJPTL cannot apply for power operation qualification

 

Maintenance

 

Power Representative Office KPJPTL

Foreign power company PT PMA

Net assets

35 Billion Rupiah (About 15.75 Million RMB)

25 Billion Rupiah (About 11.25 Million RMB)

Performance contract

10 Billion Rupiah (About 45 Million RMB)

50 Billion Rupiah (About 22.5 Million RMB)

 

6.      Construction, installation, operation and maintenance qualifications can be selected in the following four categories, as follows:

Classification

Qualification Classification

Power generation

Steam power plant (PLTU)

Gas power plant (PLTG)

Gas-steam power plant (PLTGU)

Geothermal power plant (PLTP)

Hydroelectric power plant (PLTA)

Small hydropower plant

Diesel power plant (PLTD)

Nuclear power plant

Other new energy power plants and other renewable energy power plants

Power transmission

High-voltage transmission grid and/or ultra-high-voltage transmission grid

substation

Power distribution

Medium voltage distribution line

Low-voltage distribution lines

Install electrical devices

Install high-voltage electrical devices

Install medium-voltage electrical devices

Install low-voltage electrical devices

 

7.      Before applying for SBUJPTL, you must obtain an engineer certificate SERKOM

8.      When applying for SBUJPTL, you must submit an ISO 9001 (Quality Management System) certificate and a list of engineering equipment

 

Processing Times

Processing Time : 25 Working Days

Required Documents :

KPJPTL

1.      Documents Of Parent Company:

a. Parent company’s articles of association AoA (sworn translation + notary double certification (English version/Indonesian version / Hague certification))

b. Parent company’s business license BL (sworn translation + notary double certification (English version/Indonesian version / Hague certification))

c. Letter of Intent (Double Authentication/Apostille)

d. Letter of Appointment (Double Authentication/Apostille)

e. Letter of Statement (Double Authentication/Apostille)

f. Audit report of the past 2 years

g. Legal representative’s passport

h. Parent company address, email address, phone number

2.      Documents of Indonesian Representative Office:

a. NIB

b. NPWP and SKT

c. Company Profile

d. Company organizational structure

e. Email address, phone number

3.      Documents of chief representative:

a. Personal photo (red background)

b. Passport

c. KITAS

d. NPWP

4.      Chief Representative of Indonesian nationality (guarantor)

a. Letter of Appointment

b. Personal photo (red background)

c. ID card

d. NPWP

PT PMA/PT PMDN

1.       Documents of Indonesian company:

a. Articles Of Association And Amendments (if any)

b. Approval and amendments from the Ministry of Justice (if any)

c. NIB

d. NPWP and SKT

e. Audit report of the past 2 years

f. Company Profile

g. Company organizational structure

h. Email address, phone number

2.       Documents of directors and supervisors:

a. Personal photo of the director (red background)

b. Passports of directors and supervisors

c. NPWP

d. KITAS