Toxic and hazardous waste B3 Technical approval is an approval by the government that states that companies handling toxic and harmful waste B3 must comply with standards for environmental protection and management
Basic Informations

1.      Toxic and hazardous waste B3 Technical approval is an approval by the government that states that companies handling toxic and harmful waste B3 must comply with standards for environmental protection and management

2.      If a company handles toxic and harmful waste B3 on its own without the technical approval documents for toxic and harmful waste B3, the company’s environmental technical approval will not be approved by the government, and it will not be allowed to carry out production operations.

3.      If there are no significant changes in the handling of toxic and harmful waste B3, the technical approval documents for toxic and harmful waste B3 remain valid.

4.      Industries that require B3 technical approval:

(1)    Industries handling black lead (Pb)

(2)    Industries handling B3 waste (used lead-acid batteries, used batteries, used oil, contaminated machinery)

5.      If a company only collects B3 waste and uses a third party with existing B3 technical approval for disposal, the company does not need to apply for B3 waste technical approval again. Instead, it only needs to prepare detailed technical documents for the temporary storage of B3 waste.

Processing Time & Required Documents

Processing Time : 4 Months

Required Documents :

1.      Company documents

2.      KKPR documents

3.      PTSP-LHK account and password (if available)

4.      SIINAS account and password (if available)

5.      Identification cards, passports, KITAS, tax cards, and phone numbers of directors and supervisors

6.      Information on land and buildings (leasing/purchase)

7.      Land lease contract/land sale agreement PPJB/land sale deed AJB/land certificate

8.      Building lease contract/building permit PBG & SLF building qualification certificate (if available)

9.      Company profile

10.    Company and factory organizational structure

11.    Factory floor design plan DED/SITE PLAN

12.    Factory photos (installed equipment)

13.    Production flow chart and description (including equipment details: images, names, serial numbers, quantities, origin, rated power)

14.    Names, types, images, quantities, and material safety data sheets of production products, raw materials, and auxiliary materials

15.    Toxic and harmful waste B3 used and generated by the company (names, sources, characteristics, quantities)

16.    Development plan for toxic and harmful waste B3 management facilities

17.    Coordinates of the location for storing and managing toxic and harmful waste B3

18.    Factory operating hours

19.    Employee information (number, gender, local vs. non-local ratio, positions, etc.)

20.    Sources of electricity and water (PLN/generator; PDAM/well; others)

21.    Generator/chimney information

22.    Environmental management system

23.    SOP documents

24.    Previous environmental impact assessment (EIA) reports (including EIA technical approval documents, if available)

25.    Previous EIA approval recommendation letter/EIA approval letter (including EIA technical approval letter, if available)

26.    Previous business license (if available)