1. The SLO certificate is a declaration letter indicating that the environmental protection and management standards have been met. 2. If the company has obtained the wastewater discharge technical approval letter, it must submit a report on the established discharge control measures. This report is drafted after the trial period specified in the technical approval letter has ended. 3. If the company has not obtained the wastewater discharge qualification certificate, it is not allowed to continue processing the PBG building permit and the SLF inspection certificate. 4. The validity of the wastewater discharge qualification certificate is unlimited. However, if there is a change in the scope of operations, the company must draft a new technical approval letter and a new wastewater discharge qualification certificate. |
Processing Time : 3 Months Required Documents : 1. Company Articles of Association and Amendments (if any) 2. Ministry of Justice Approval Letter and Amendments (if any) 3. Commercial Registration Certificate (NIB) 4. Standard Certificate SS/Business License IZIN (if any) 5. Company Tax Card (NPWP) 6. OSS Account and Password 7. KKPR Document 8. PTSP-LHK Account and Password (if any) 9. SIINAS Account and Password (if any) 10. Directors and Supervisors’ Identification Cards, Passports, KITAS, Tax Cards, Phone Numbers 11. Land and Building Condition and Information (Leased/Purchased) 12. Land Lease Agreement/Land Sale Agreement PPJB/Land Sale Deed AJB/Land Certificate 13. Building Lease Agreement/Building Permit PBG & SLF Building Qualification Certificate (if any) 14. Company Profile 15. Company and Factory Organizational Structure 16. Factory Floor Plan DED/SITE PLAN 17. Factory Photos (Installed Equipment) 18. Production Flowchart and Description (Including Equipment Information: Photos, Names, Numbers, Quantities, Origins, Rated Power) 19. Names, Types, Photos, Quantities, and Material Safety Sheets of Products, Raw Materials, and Auxiliary Materials 20. Factory Operating Hours 21. Employee Information (Number, Gender, Local vs. Foreign Ratio, Positions, etc.) 22. Factory Dormitory Information (if any) 23. Source of Electricity and Water (PLN/Generator; PDAM/Well Water; Other) 24. Water Usage Requirements and Specifications 25. IPAL Wastewater Treatment Plant and/or Sludge Treatment Plan and Process 26. Untreated Wastewater at IPAL/WWTP Wastewater Treatment Plant and Treated Wastewater at IPAL/WWTP Wastewater Treatment Plant Specifications (if IPAL/WWTP Wastewater Treatment Plant is installed) 27. Laboratory Sampling Documents from the Trial Period 28. Environmental Laboratory Registration Certificate 29. Environmental Management System 30. PPPA Water Pollution Control and POPAL Wastewater Treatment Certificates 31. SOP Documents (Raw Material and Auxiliary Material Procurement SOP, Raw Material and Auxiliary Material Reception SOP, Raw Material and Auxiliary Material Storage SOP, Production Process SOP, Packaging SOP, Product Storage SOP, Shipping SOP, Emergency SOP, etc.) 32. Previous Environmental Impact Assessment (EIA) Report (including EIA Technical Approval Documents, if any) 33. Previous EIA Approval Recommendation/Approval Letter (including EIA Technical Approval Letter, if any) 34. Previous Business License (if any) |